Skip to Main Content
UTD's student-run newspaper since 1980

The UTD Mercury

UTD's student-run newspaper since 1980

The UTD Mercury

UTD's student-run newspaper since 1980

The UTD Mercury

Stairs from the second to the third floor of the recently-opened ECSW building are blocked off until further notice. Photo by Noah Whitehead | Photo Editor.

ECSW still undergoing construction, repairs

September 16, 2018

The new Engineering and Computer Science West building opened its doors at the beginning of the semester, but not all areas of the building are fully functional. The 200,000-square foot facility primarily...

Ankith Averineni

New tutoring space opens for engineering, computer science majors

October 20, 2016

Clubs on campus helped put together a new space to assist upper-level engineering and computer science majors with their studies. Throughout the summer and this semester, the space, located in Synergy...

Richard Benson (center), the university president, was joined by UTD officials and members of Student Government, such as SG President Akshitha Padigela (second from right) and SG Vice President Joey Campain (third from left) at the groundbreaking of the new engineering building on Oct. 6. The 200,000 square-foot project is set to be complete in the summer of 2018 and will cost $110 million. Photo by Chris Lin | Mercury Staff.

Construction begins on new engineering building

October 8, 2016

UTD officials and faculty commemorated the groundbreaking of a new building on campus on Oct. 6. The latest addition, which will primarily host the mechanical engineering department, is scheduled to be...

YouTube Recommendation: Game Theory

YouTube Recommendation: Game Theory

February 26, 2015

To be completely honest, I had a hard time coming up with a topic for this week’s blog. I thought I would make a Netflix recommendation, but I could only think of shows that many people are already...

Load More Stories
Activate Search
Engineering